Key Takeaways & Quick Answer
Direct Answer: How much does a home renovation cost in Los Gatos in 2026? A whole-home renovation in Los Gatos costs $120,000–$400,000+ in 2026, based on our 8 completed Los Gatos area projects between January 2025 and January 2026. Costs vary significantly by home age, hillside lot conditions, and scope of work.
Primary Stat: The average whole-home renovation in Los Gatos costs $165,000–$310,000 based on our 8 completed projects in 2025–2026.
Critical Fact: Los Gatos now enforces updated Hillside Development Standards and Santa Clara County electrification requirements, adding $10,000–$20,000 to renovation budgets compared to 2024 costs.
Timeline: Most whole-home projects take 14–26 weeks from design to completion.
ROI Factor: Los Gatos homeowners typically recoup 70–80% of renovation costs at resale, with homes in the $2M–$4M range seeing the strongest returns.
| Quick Facts | 2026 Data |
| Average Cost | $165,000–$310,000 |
| Typical Timeline | 14–26 weeks |
| Permit Wait Time | 3–6 weeks |
| ROI Percentage | 70–80% |
| Most Popular Style | Warm minimalism with open concept layouts |
📖 Read Time: 9 minutes
✍ Author: Yoni Asulin, Lead Contractor, ASL Remodeling
🏗 License: CSLB #1060310
📅 Updated: February 8, 2026
📍 Service Area: Los Gatos, Monte Sereno, Saratoga, Campbell
Written by Yoni Asulin, Lead Designer & Licensed General Contractor at ASL Remodeling – Design & Build
Yoni Asulin has completed 500+ remodeling projects throughout the Bay Area since 2014, specializing in design-build kitchen, bathroom, and whole-home renovations. Licensed contractor (CSLB #1060310) with expertise in Los Gatos permit navigation, hillside development compliance, and modern construction methods.
Last Updated: February 8, 2026
Next Review: May 2026
You’re considering a renovation for your 1970s ranch on Shannon Road or your mid-century home near Belgatos Park, and you want to know what you’re getting into before signing a contract. That’s the right instinct; in Los Gatos, where town regulations, hillside standards, and Santa Clara County codes all intersect, the planning stage determines whether your project runs smoothly or stalls out.
“How much does a renovation cost in Los Gatos?” is the question we hear most from homeowners in the area. After completing 8 whole-home renovation projects across Los Gatos neighborhoods during 2025, we’ve built detailed cost data that reflects the town’s unique challenges, from hillside development requirements to the updated electrification mandates affecting every major project.
In this guide, based on our real-world project experience, you’ll discover:
What You’ll Learn:
- How much does a whole-home renovation cost in Los Gatos in 2026? — Including neighborhood-specific cost factors for flatland vs. hillside homes
- What is the typical timeline for a Los Gatos renovation? — With 2026 permit wait data from the Community Development Department
- Which 2026 code changes impact your Los Gatos renovation budget? — Electrification, Title 24, and Hillside Development Standards updates
- What materials and upgrades deliver the best ROI? — Based on 8 local projects
This guide reflects actual 2026 costs, updated permit requirements, and lessons learned from our most recent Los Gatos projects.
Information Source: All data comes from ASL Remodeling’s completed projects (Jan 2025 – Jan 2026), Town of Los Gatos Community Development Department records, and direct supplier pricing.

How much does a whole-home renovation cost in Los Gatos in 2026?
Direct Answer: A whole-home renovation in Los Gatos costs $120,000–$400,000+ in 2026, based on 8 projects we completed between January 2025 and January 2026. Cost varies by home size, lot conditions, and whether your property falls under hillside development standards.
Los Gatos renovation costs run 10–20% higher than nearby Campbell or San Jose averages due to the town’s stricter development standards, larger home sizes, and the prevalence of hillside lots that require additional engineering. However, the investment delivers strong returns, Los Gatos median home values consistently rank among the highest in Santa Clara County.
| Project Type | Cost Range | Timeline | What’s Included |
| Selective Renovation | $120,000–$200,000 | 14–18 weeks | Kitchen and bathroom updates, new flooring, interior paint, lighting upgrades, basic electrical updates |
| Mid-Range Whole-Home | $200,000–$320,000 | 18–24 weeks | Full kitchen and bath renovation, open concept layout changes, new white oak cabinets, quartzite countertops, SPAN smart panel, curbless shower installation |
| High-End Transformation | $320,000–$400,000+ | 22–30 weeks | Structural modifications, hillside engineering, LaCantina doors, black aluminum windows, full electrification with heat pump water heater, EV charging station, TOTO Neorest fixtures, custom millwork throughout |
Data Source: ASL Remodeling projects completed in Los Gatos (Jan 2025 – Jan 2026)
What Impacts Renovation Costs the Most in Los Gatos?
Based on our project tracking:
1. Hillside Lot Conditions (15–25% of budget for applicable homes)
Roughly 40% of Los Gatos homes sit on hillside lots subject to the town’s Hillside Development Standards. These properties require geotechnical reports ($5,000–$12,000), retaining wall assessments, and sometimes grading permits before renovation work begins. Our Belgatos area project in September 2025 required $28,000 in hillside compliance work, including a geotechnical survey and engineered drainage plan, before interior renovation could start. Flatland homes in neighborhoods like Blossom Hill and Almond Grove avoid most of these costs.
2. Electrification and Energy Upgrades (5–10% of budget)
Santa Clara County now enforces updated electrification requirements for major renovations. This means budgeting for an induction cooktop ($2,500–$6,000 installed), heat pump water heater ($4,000–$8,000 installed), and SPAN smart panel ($6,000–$10,000 installed) to manage the increased electrical load. Los Gatos homeowners who add an EV charging station during renovation save $3,000–$5,000 versus a standalone installation later. Title 24 compliance for windows and insulation adds another $4,000–$10,000 depending on home size and window count.
3. Permit and Professional Fees (8–12% of budget)
The Town of Los Gatos Community Development Department charges $3,000–$10,000 in permit fees for whole-home renovations, with additional fees for hillside review. Architectural planning costs $6,000–$18,000, and structural engineering adds $3,000–$7,000. Our design-build approach bundles these services, which typically saves clients 15–20% versus hiring each professional separately. We handle permit-ready plans and all Town submissions.
Pro Tip from Our Team: Los Gatos processes most residential permits through its Community Development Department, which is significantly smaller than San Jose’s or San Francisco’s building departments. This means shorter wait times for standard projects (3–4 weeks vs. 6–8 weeks in larger cities), but also less scheduling flexibility for inspections. Book your inspections the moment each phase completes, the town’s inspection calendar fills quickly, especially in spring and summer.
What is the typical timeline for a whole-home renovation in Los Gatos?
Direct Answer: A whole-home renovation in Los Gatos takes 14–26 weeks from initial design meeting to final inspection, based on 8 projects we completed in 2025–2026. Hillside properties and projects requiring structural changes trend toward the longer end.
Timeline Breakdown: Los Gatos Whole-Home Renovation (2026)
| Phase | Duration | 2026 Update | Key Activities |
| Design & Permitting | 4–7 weeks | +1 week vs 2024 | Architectural planning, 3D design, material selection, permit submission to Community Development |
| Demolition & Structural | 2–3 weeks | No change | Selective demo, load-bearing modifications, foundation work if needed |
| Rough-In | 3–5 weeks | No change | Plumbing, electrical (SPAN smart panel), framing, HVAC updates |
| Inspection #1 | 1 week | No change | Town of Los Gatos rough inspection for framing, electrical, plumbing |
| Finishes & Installation | 3–5 weeks | No change | Cabinets, quartzite countertops, zellige tile, trimless recessed lighting, flooring |
| Final Fixtures | 1–2 weeks | No change | TOTO Neorest installation, unlacquered brass fixtures, curbless shower glass, appliances |
| Final Inspection & Punch | 1–2 weeks | No change | Town final walkthrough, Title 24 compliance verification, punch list completion |
| TOTAL | 14–26 weeks | +1–2 weeks vs 2024 | Design to completion |
2026 Permit Update: Los Gatos now requires Title 24 energy compliance documentation at permit submission, consistent with statewide changes. This front-loads 1–2 weeks of energy calculations into the design phase but prevents delays during construction.
Timeline Optimization Tips:
- Order materials early: Custom white oak cabinets now have 6–8 week lead times, Title 24 windows require 8–10 weeks for custom sizing, and LaCantina door systems run 8–12 weeks from order to delivery
- Schedule inspections immediately: Los Gatos inspectors book 3–5 business days out; summer months push to 7+ days
- Bundle electrification with rough-in: Installing the heat pump water heater, induction cooktop wiring, and EV charging station during rough-in prevents costly re-opening of walls later
- Know your lot status: If your home sits on a hillside lot, start the geotechnical process during the design phase, not after permit submission
Which 2026 code changes impact your Los Gatos renovation budget?
Direct Answer: Three major code changes in 2025–2026 affect Los Gatos renovation budgets: Santa Clara County electrification requirements, updated Title 24 energy standards, and refreshed Hillside Development Standards for qualifying properties. Together, these add $10,000–$30,000 to a typical whole-home project.
2026 Code Impact Comparison
| Code Change | Budget Impact | Timeline Impact | Applies To |
| Electrification Requirements | +$10,000–$18,000 | +1 week | All major renovations touching gas systems |
| Title 24 Energy Update | +$4,000–$10,000 | +1–2 weeks (design phase) | All permitted renovation work |
| Hillside Development Standards | +$5,000–$15,000 | +2–4 weeks | Homes on designated hillside lots |
Data Source: ASL Remodeling permit tracking (8 Los Gatos projects, Jan 2025 – Jan 2026) and direct communication with Los Gatos Community Development Department.
The silver lining: California’s electrification rebates offset $2,000–$4,000 of these costs. Additionally, homes with a modern aesthetic featuring a SPAN smart panel, heat pump systems, and full electrification command premium prices in Los Gatos’s competitive market — buyers in the $2M–$4M range increasingly expect these upgrades as standard.
Los Gatos vs. Neighboring Cities: How Regulations Compare
| Regulation | Los Gatos | San Jose | Campbell | Saratoga |
| Permit Timeline | 3–6 weeks | 4–8 weeks | 3–5 weeks | 4–7 weeks |
| Hillside Standards | Strict | Varies by area | Minimal | Strict |
| Historic Review | Old Town overlay | Limited | None | Limited |
| Electrification | County mandate | County mandate | County mandate | County mandate |
| Tree Protection | Heritage tree ordinance | Limited | Limited | Strict ordinance |
This comparison helps you understand why renovation planning in Los Gatos requires more upfront attention to regulatory compliance than some neighboring towns — but also why the approval process is often faster once your plans are complete and thorough.

Real Project: Belgatos Area Whole-Home Transformation
Project Overview: Bacigalupi Drive, Los Gatos
Completed: September 2025
Scope: Full renovation of a 2,100 sq ft mid-century ranch — two bathrooms, kitchen, great room conversion, and full electrification
Budget: $267,000 (final cost 3% under initial $275,000 estimate)
Timeline: 22 weeks (design to completion)
Unique Challenge: Hillside lot requiring geotechnical review and engineered drainage before structural work could proceed
Our Solution: Parallel-tracked the geotechnical process with design development, saving 3 weeks of potential delays
The Challenge
In September 2025, we completed a whole-home renovation on Bacigalupi Drive in the Belgatos area where the homeowners wanted to transform a compartmentalized 1972 ranch into an open concept living space with indoor-outdoor living connectivity. The property sits on a moderate hillside lot, triggering the town’s Hillside Development Standards and requiring additional compliance steps before permits could be issued.
The Specific Issues:
- Hillside lot requiring geotechnical report and engineered drainage plan
- Two load-bearing walls separating kitchen, dining, and living areas
- Outdated 100-amp electrical panel insufficient for modern electrification
- Original single-pane windows failing Title 24 energy requirements
Our Solution
We solved this by running the geotechnical process in parallel with design development, and our general contractor team coordinated all hillside compliance work within the planned demolition phase:
- Geotechnical Compliance & Drainage: Parallel-tracked with architectural planning
- Cost impact: $14,000 (survey + drainage engineering)
- Timeline impact: 0 additional weeks (completed during design phase)
- Structural Open Concept Conversion: Removed two load-bearing walls with engineered steel beams
- Created a 32-foot open great room connecting kitchen to rear yard
- LaCantina doors installed on the new rear opening with black aluminum windows flanking
- Modern aesthetic achieved throughout with clean sightlines
- Full Electrification Package: SPAN smart panel (200-amp upgrade), heat pump water heater, induction cooktop, EV charging station
- Eliminated all gas appliances — warm minimalism design throughout
- Total electrification cost: $16,500
- Energy Compliance: All windows replaced with Title 24 compliant units
- Trimless recessed lighting throughout reduced energy consumption 40%
- Added insulation above current code minimums
The Result
- Final Cost: $267,000 ($8,000 under initial $275,000 estimate)
- Timeline: Completed in 22 weeks (on schedule despite hillside compliance requirements)
- Homeowner Feedback: “We dreaded the hillside permit process, but ASL handled the geotechnical work while we were still picking finishes. The open layout with those LaCantina doors — we basically live outside now. The quartzite countertops and unlacquered brass fixtures give everything a timeless feel.”
- Key Metric: Home appraised at $2.6M post-renovation, up $380,000 from pre-renovation value
Lesson Learned: For hillside lots in Los Gatos, always start the geotechnical process during design — not after. Parallel-tracking these requirements with architectural planning can save 3–4 weeks of dead time that most contractors waste waiting for reports.
Los Gatos Renovation Permit Comparison: Key Metrics 2026
Permit Timeline by Scope (Updated February 2026)
| Permit Type | Avg Wait Time | Cost | 2026 Changes | Our Experience |
| Over-the-Counter (minor) | 1–2 weeks | $400–$1,200 | No major changes | 4 permits filed |
| Plan Review (structural) | 3–5 weeks | $3,000–$7,000 | +1 week vs 2024 | 6 permits filed |
| Full Building Permit | 4–6 weeks | $6,000–$10,000 | New Title 24 docs required | 3 permits filed |
| Hillside Review Add-On | +2–4 weeks | $2,000–$5,000 | Updated geotechnical requirements | 4 permits filed |
Data Source: ASL Remodeling permit tracking database (8 Los Gatos projects, Jan 2025 – Jan 2026) and direct communication with the Town of Los Gatos Community Development Department.
What Makes Los Gatos Permits Different?
Los Gatos is an incorporated town — not a city — which means its Community Development Department handles both planning and building functions in a more consolidated process. For homeowners, this has advantages: your architectural planning documents, permit-ready plans, and building applications all flow through one department. The trade-off is that the department is smaller, so response times depend heavily on seasonal workload and staffing.
Three things that commonly surprise Los Gatos homeowners:
- Heritage Tree Ordinance: If your renovation impacts trees with trunks over a certain diameter, you’ll need a separate tree removal or protection permit — this can add 2–3 weeks
- Old Town Design Review: Properties within the Old Town overlay district face additional architectural review for exterior changes
- Neighbor Notification: Some projects trigger neighbor notification requirements, adding 10–15 days to the approval timeline

Related Resources from ASL Remodeling
If you’re planning a renovation, these guides provide additional insights from our project experience:
Planning & Budget Resources:
- Our Design-Build Process — Understand how we streamline renovation from concept to completion
- Kitchen Renovation Services — Detailed guide to kitchen-specific costs and timelines
Related Services:
Ready to start planning? Explore our approach to whole-home renovations in Los Gatos or learn about our kitchen renovation services and bathroom renovation expertise.
Frequently Asked Questions: Renovation Planning in Los Gatos
Have questions about your specific renovation project?
Contact our team. Office Location: ASL Remodeling 690 Saratoga Ave, STE 100, San Jose, CA 95129
Contact Us